top of page
Search
Writer's picturePine Ridge Bible Camp

Moving a Water System

With winter on it's way sooner than we like once again, Bruce and Noah have been working on getting the water system moved out of the old log house. The only reason the house has been heated for quiet a few years now is because the camp water system still runs through the basement. With the new well up and running, the guys are working to re-do the water system with a well at either end of camp. This will allow us to negate the very old well (where all the current pipes run through and someone has to go down into to access everything for the camp) along with the need to keep the old log house standing. We are looking forward to not having to heat the log house with wood (or electric shop heaters if everyone is away - making a very high electrical bill) all winter again! #PRBC #NewDiningHall #NewWell #NewWaterSystem




15 views0 comments

Recent Posts

See All

Comentarios


bottom of page